Restricted Access · Clients & Partners
Client Portal

This portal is for Capital Delivery Africa's institutional clients, JV partners, cornerstone entities, and strategic counterparties. Investor access is through a separate portal.

Incorrect credentials. Contact Capital Delivery Africa's administrative team if you require access.
Investor Access
Investor Portal →

Client credentials are issued by Capital Delivery Africa's administrative office.
Public site: capitaldelivery.africa

🌍
Capital Delivery Africa · Client Portal
Infrastructure Builder and Operator · EAC & Sub-Saharan Africa · Restricted Access
Platform Status
Active
Gold Layer — Tanzania
Q2 2026
DRC Commercial Launch
100%
Settlement Standard
5
Active Layers in Pipeline
Q2 2026 · Capital Delivery Africa — Entity Launch
Capital Delivery Africa is operationalising as the continental platform entity. It will become the primary JV partner in CDA4N (Tanzania) and in all subsequent cornerstones across the continent, replacing Capital Delivery as the upstream partner. The current operational infrastructure and all institutional relationships remain intact through this transition.
Critical Minerals — Layer Expansion
Capital Delivery is extending the platform to include critical minerals as a named layer — cobalt, coltan, lithium, and manganese — through the existing DRC corridor infrastructure. The same gate system, compliance architecture, and sovereign settlement framework that governs gold governs all critical minerals layers. Clients with relevant supply or demand-side relationships are invited to discuss engagement.
Entity Architecture
Capital Delivery Group — Current Structure April 2026
EntityRoleLocationStatus
Capital Delivery Origin entity · Platform architect · Temporary parent Washington, DC Active
Capital Delivery Africa Continental platform · Infrastructure Builder and Operator Africa · Mauritius (forming) Q2 2026
CDA4N Tanzania cornerstone · JV with A4N Group · Mwanza Refinery Dar es Salaam + Mwanza Active · 2022
Mauritius Holdco International holding structure for African operations Mauritius Forming
Platform Layers
The Layer Architecture
Capital Delivery operates through a layered infrastructure stack. Gold is Layer 1 — the foundation everything else is built on. Each subsequent layer rides on the corridor infrastructure, compliance framework, government relationships, and sovereign settlement architecture that Layer 1 proved. The gate system — G01 to G06 — is the protocol. It is fixed, universal, and unchanged across every layer and every corridor. A kilogram of gold and a tonne of cobalt pass through the same six gates. The protocol is what makes the stack scalable, not just repeatable.
Layer 01 · Active · Foundation
Gold
The base of the stack. DRC → EAC corridor → Mwanza Refinery → Bank of Tanzania. Operational since 2022. Every layer above this one is built on what Layer 1 proved — the corridor, the relationships, the compliance framework, the settlement architecture.
Layer 02 · In Formation
Copper & Critical Minerals
Rides on Layer 1. DRC copper belt, cobalt, coltan, lithium, manganese. The same corridor, the same gate system, the same compliance architecture, the same sovereign settlement framework — applied to a new material set. The infrastructure cost of Layer 2 is a fraction of Layer 1 because the stack is already built.
Layer 03 · Pipeline
Agriculture
Rides on Layers 1 and 2. EAC smallholder producers — coffee, sesame, macadamia, cashew. Identical structural problem to minerals: absent institutional framework, no standardised export process. The corridor and government relationships already exist. 2027 target.
Layer 04 · Pipeline
Power
Cross-border energy trading. EAC Power Pool framework. Renewable generation in landlocked countries, transmission infrastructure, sale to grid operators. 2027–2028.
Layer 05 · Pipeline
Infrastructure
Corridor logistics and physical infrastructure as owned assets. Revenue: usage fees from platform operators. Long-term barrier-to-entry reinforcement.
Layer 06 · Pipeline
Carbon
EAC and SADC carbon sinks and biodiversity credits. Institutional-grade carbon market access through the same corridor infrastructure.
Corridor Portfolio
Active and Pipeline Corridors
CorridorRouteLayersStatus
Central Corridor DRC → Tanzania (Mwanza) Gold · Copper · Critical Minerals Active
Northern Corridor DRC → Uganda → Kenya Gold · Copper · Critical Minerals · Agriculture Year 2–3
Lobito Corridor DRC → Zambia → Angola Copper · Critical Minerals Pipeline
SADC Corridor Zambia · Zimbabwe · Mozambique Copper · Critical Minerals · Agriculture Year 3–4
Gate System — G01 to G06
The Gate System — The Protocol
Every transactional event — across every layer and every corridor — passes through the same six-gate process. The gate system is the protocol that binds the layer stack together. It is fixed, non-negotiable, and applied uniformly regardless of commodity, corridor, or layer. No event settles without completing every prior gate. Every event carries a structured Event ID — format: CD-{CORNERSTONE}-{MATERIAL}-{YEAR}-{SEQ} — providing a permanent, linkable record across the full data architecture. DRC-based teams administer G01–G03 at origin. CDA4N administers G04–G06 at the Tanzania terminal.
Gate System — Current Event StatusLive
GateFunctionLocationAdministered By
G01Material Assessment / KYCOrigin CountryDRC Operations Team
G02Compliance & CertificationOrigin CountryDRC Operations Team
G03Logistics & Export ClearanceOrigin CountryDRC Operations Team
G04Terminal Receipt — MwanzaTanzaniaCDA4N
G05Refinery Intake — MPMR (97%)Mwanza RefineryCDA4N
G06Settlement Waterfall — Bank of TanzaniaMwanza RefineryCDA4N
Certifications Held
Active Certifications — All LayersCurrent
CertificationFull NameScopeStatus
ICGLR RCMGreat Lakes Regional CertificationAll EAC/DRC materialActive
FairminedASM Ethical StandardArtisanal mining operationsActive
LBMA RGGLondon Bullion MarketGold settlement documentationActive
Dodd-FrankSection 1502 Conflict MineralsUS-facing supply chainsActive
OECD DDGDue Diligence GuidanceConflict-affected areasActive
Platform Documents
Operational & ComplianceConfidential
  • Capital Delivery Africa — Platform Overview
    April 2026
    View
  • Gate System Reference — G01 to G06
    April 2026
    View
  • Compliance & Certification Framework — v3.0
    January 2026
    View
  • Layer Architecture — Gold, Copper, Critical Minerals
    April 2026
    View
  • Corridor Portfolio — EAC and SADC
    April 2026
    View
  • Critical Minerals Framework — Cobalt, Coltan, Lithium, Manganese
    April 2026 · Draft
    View
  • Data Schema — Event ID · Layer Linking · Query Architecture
    April 2026
    View
  • Gate System Reference — G01–G06 Protocol · Cross-Layer Application
    April 2026
    View
Settlement & Operational RecordsConfidential
  • Q1 2026 Settlement Records — Gold Layer
    March 2026
    View
  • Annual Compliance Report — 2025
    February 2026
    View
  • ICGLR Certification Package — Current
    Q1 2026
    View
Platform Contacts
Platform Operations
Capital Delivery Africa
Continental Platform
Compliance
Compliance Team
Capital Delivery Africa
CDA4N Tanzania
CDA4N Operations
Dar es Salaam + Mwanza
Administration
Administrative Office
Capital Delivery Africa
Office Locations
Physical Offices
OfficeAddressEntityFunction
Washington, DC 470 L'Enfant Plaza SW, Suite 23248, 20024 Capital Delivery Parent entity HQ
Dar es Salaam Kishan Towers, United Nations Road CDA4N Tanzania HQ
Mwanza Mwanza Precious Metals Refinery Compound CDA4N Operational Office